Gordon Hall at Harvard Medical School
Nov 2019, Week 1: Camera 1
Empty second floor study space.
Nov 2019, Week 1: Camera 2
unfinished, uncarpeted space that is under construction with wires hanging from the ceiling.
Nov 2019, Weeks 2-3: Camera 1
reading room with carpet and ceiling panels removed.
Nov 2019, Weeks 2-3: Camera 2
outside fenced portion of the library with three construction men wearing white clothes.
Dec 2019, Week 1: Camera 3
construction cones and caution tape blocking off a pile of dirt outside the library
Dec 2019, Weeks 2-3: Camera 3
Garbage bags of construction materials on the floor. Dry wall work prep from construction worker.
Jan 2020, Week 1: Camera 1
Construction materials spread out on the floor. Doors are removed from the walls.
Jan 2020, Week 1: Camera 2
Construction cones and caution tape blocking off a small section of dirt outside.
Jan 2020, Week 1: Camera 3
drywall with wooden panel and wires hanging from the wall
Jan 2020, Weeks 2-3: Camera 1
old reading room with floors and ceilings removed. ladders and wires on the floor.
Jan 2020, Weeks 2-3: Camera 2
construction cones and wired fence blocking off a small area outside of the library.
Jan 2020, Weeks 2-3: Camera 3
Old reading room with carpet and ceilings removed. Construction materials dispersed throughout the room.
Feb 2020, Week 1: Camera 2
gated construction area outside of library with orange construction cones and caution tape
Feb 2020, Week 1: Camera 3
lower level 1 atrium construction. ceiling and floor removed. new circulation desk is assembled.
Feb 2020, Weeks 2-3: Camera 1
old reading room with ceilings and flooring removed. white plastic covering walls due to construction.
Feb 2020, Weeks 2-3: Camera 2
gated construction area outside of library with orange construction cones and caution tape
Feb 2020, Weeks 2-3: Camera 3
construction crane putting bridge in place for new library entrance.
March 2020, Week 1: Camera 1
new concrete bridge outside the library at Huntington Avenue side.
March 2020, Week 1: Camera 3